|
Type/ Item |
WNS0.3 |
WNS0.5 |
WNS0.7 |
WNS1 |
WNS2 |
WNS3 |
WNS4 |
WNS5 |
WNS6 |
WNS8 |
WNS10 |
WNS12 |
WNS15 |
WNS20 |
||
|
Rated Capacity |
t/h |
0.3 |
0.5 |
0.7 |
1 |
2 |
3 |
4 |
5 |
6 |
8 |
10 |
12 |
15 |
20 |
|
|
Rated Steam Pressure |
Mpa |
0.7 |
1.25 |
1.0 |
1.25/1.6/2.5 |
|||||||||||
|
Rated Steam Temperature |
℃ |
170 |
193 |
184 |
193/204225 |
|||||||||||
|
Feed-water Temperature |
℃ |
20 |
104 |
|||||||||||||
|
Heat Transmission Area |
m² |
10.3 |
15 |
18 |
25 |
57 |
82 |
103 |
128 |
154 |
208 |
268 |
308 |
390 |
516 |
|
|
Applicable Fuel |
|
Light oil, heavy oil, gaseous fuel |
||||||||||||||
|
rate-of-fuel-flow indicator |
Heavy Oil |
kg/h |
20 |
34 |
46 |
66 |
122.5 |
189 |
258 |
319 |
370 |
485 |
609 |
730 |
915 |
1220 |
|
Light Oil |
kg/h |
18 |
32 |
42 |
61 |
120 |
184 |
243 |
300 |
354 |
472 |
580 |
707 |
849 |
1157 |
|
|
Natural Gas |
Nm/h |
21 |
40 |
50 |
72 |
158 |
225 |
313 |
375 |
452 |
627 |
770 |
926 |
1027 |
1330 |
|
|
Urban Coal Gas |
Nm/h |
48 |
74 |
103 |
148 |
295 |
144 |
592 |
740 |
868 |
1185 |
1465 |
1758 |
2200 |
3073 |
|
|
supply gas pressure |
Natural Gas |
mbar |
20-40 |
30-100 |
30-80 |
50-100 |
50-100 |
50-200 |
100-200 |
100-200 |
100-200 |
150-300 |
100-300 |
150-300 |
50-300 |
150-300 |
|
Urban Coal Gas |
mbar |
20-40 |
50-100 |
30-80 |
70-100 |
70-200 |
70-200 |
00-200 |
100-200 |
100-200 |
100-300 |
100-300 |
150-300 |
50-300 |
50-300 |
|
|
electric power |
Heavy Oil |
kw |
|
|
|
7.1 |
19.4 |
21.7 |
26.2 |
277 |
41.9 |
57.4 |
58.4 |
58.4 |
86.5 |
118.5 |
|
Light Oi |
kw |
0.5 |
1.86 |
2 |
2.6 |
6.2 |
8.5 |
13.0 |
14.5 |
19.5 |
|
|
|
|
|
|
|
Gas |
kw |
1.5 |
2.05 |
2.3 |
2.5 |
6.2 |
10.5 |
13 |
17.5 |
19.5 |
21.5 |
32 |
32 |
51 |
77 |
|
|
Max Transportation Weight of Boiler |
t |
1.9 |
2.5 |
3.5 |
5.5 |
7.6 |
9.9 |
11.7 |
13.7 |
15.9 |
18 |
25.4 |
27.2 |
40 |
45.5 |
|
|
Full Water Capacity of Boiler |
m² |
0.8 |
1.8 |
2.0 |
3.1 |
5.1 |
5.6 |
6.3 |
10.4 |
8.9 |
12.8 |
18.8 |
22.8 |
24.2 |
34.1 |
|
|
Boiler external dimensions |
Length mm |
2470 |
2950 |
3300 |
3650 |
4650 |
4650 |
4800 |
6000 |
6300 |
6500 |
7400 |
8870 |
8700 |
10000 |
|
|
Width mm |
1330 |
1570 |
1620 |
1950 |
2100 |
2200 |
2300 |
2600 |
2700 |
2950 |
3730 |
3730 |
4100 |
4500 |
||
|
Height mm |
1500 |
1820 |
1950 |
2200 |
2450 |
2650 |
2800 |
2900 |
2900 |
3100 |
3530 |
4500 |
3800 |
5600 |
||



After you receive the boiler, we will guide you to make some preparation for installation, and our experts will offer overseas installation service if you need, and fly to the installation site within 72 hours.
Normally the boiler is designed for 15 years life span, but with correct operation and well maintenance, the boiler operation life will be longer.
Inspect every 2~3 weeks, mainly checking valves, pipe, flanges, if any leakage, repair it timely. While every quarter, make a whole inspection and repair.
If you have special requirements, we can take a special approach.
Contact: Leineng
Phone: +86-18339465566
Tel: +86-18339465566
Email: leinengboiler@gmail.com
Add: No. 21-1 Xingyang Equipment Manufacturing Industrial Park, Keji Second Road,Xingyang City, Zhengzhou City, Henan Province
Scan to chat on WeChat